
New TopShim run:

version = topshim 2.1.0
date = 2023-07-11
time = 17:25:29.005
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0168
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before=48.5 Hz, Target= 0.3 Hz, After= 0.8 Hz
Iteration 2: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 4: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration 5: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration 6: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.587

shim changes: 
Z	+601
Z2	-29
Z3	-53
Z4	-605
Z5	+467
Z6	+2823
Z7	-1484
Z8	-15362

duration = 2 min 22 sec
completed successfully
finished Tue Jul 11 17:27:49 2023


========================================================================
